
What is the hidden and potentially life endangering problem with the growing trend of municipalities requiring that plan acceptance of sprinkler system installation drawings and hydraulic calculations requires only that the items be stamped by 'joe any engineer' rather than having dedicated in-house drawing and design review by educated and qualified plan reviewers as intended by NFPA 13? What are the legal ramifications for the municipality, contractor and engineer of record?
Coming Soon...